Home Page
 

  Previous Page Next Page
   

This section

Installation and site requirements


Other Sections

General questions

Specific by fuel type

 

Gas Fired Models - Fuel Supply

Gas.

The gas supply pipe will normally be of 15mm diameter copper tube and be brought along to the front, lower corner of the left or right hand, side panels. In some cases it is also possible to bring the gas supply directly into the Aga through the base.

With the 3 oven model, there is provision for bringing the gas supply through the left hand side panel towards the rear.